A roof replacement means tearing the old roof off down to the wood and building a new one: underlayment, ice and water shield, flashing, vents and new shingles. Most Calgary homes take 2 to 4 days on site. It carries our 5-year workmanship warranty plus the shingle maker's material warranty.

What's included

  • Tear-off and disposal of the old roof
  • Underlayment, plus ice and water shield at the eaves and valleys
  • Flashing, vents and ridge cap
  • Essential, Signature or Fortified shingles
  • Clean-up and a magnet sweep for nails

What sets the price

Mostly the size of the roof, its pitch and shape, how many layers come off, and which shingle you pick. Rotten decking (the wood under the shingles) is only replaced with your written approval, at $120 a sheet.

When to get in touch

  • Shingles curling, cracking or losing granules across the roof
  • Leaks in more than one place, or repairs that keep coming back
  • Hail or wind damage on several slopes
  • A roof around 20 years old or more

What happens next

  1. Send us your address in the form below.
  2. We measure the roof and prepare your quote.
  3. We walk you through it in person. You sign with a 30% deposit.
  4. Work starts within 3 weeks of the deposit.
GET A ROOF QUOTE

A roof replacement quote is mostly a list of things you can't see. Anyone can price shingles. What separates two quotes is whether the underlayment (the layer under the shingles), the ice and water shield (a sticky waterproof membrane at the edges and valleys), the flashing, the ventilation and the condition of the wood deck are in it, or quietly left out so the total looks lower.

We install three tiers of shingle and we itemize what's underneath them. The shingle is your choice. Everything below it is the same standard either way, because that's the part that decides whether the roof lasts.

Synthetic underlayment rolled out on a Calgary roof

The three shingles

We install three shingles. A contractor offering nine shingle lines is offering you a decision you have no basis to make.

  • Essential. Architectural shingles, Class 3 impact rated. The reliable choice for a roof built for normal weather.
  • Signature. Heavier designer shingles, Class 3 impact rated, with a deeper shadow line. It's the one we recommend for most Calgary homes.
  • Fortified. Class 4 impact rated shingles, the top hail rating: a two-inch steel ball dropped twice on the same spot without cracking the shingle. In Hailstorm Alley it's worth a hard look.

What Class 4 actually buys you

It does not make a roof hail-proof. Class 3, the rating on Essential and Signature, means the shingle passed UL 2218 with a 1.75-inch steel ball; Class 4 is the 2-inch ball, one step up. A Class 4 shingle is more likely to come through a storm that would crack a lower-rated one. The rating isn't a guarantee against hail, and shingle warranties commonly don't cover hail damage. A Class 4 roof may qualify for an insurance premium discount; confirm with your insurer.

The parts of the quote that aren't shingles

These are the lines to compare between quotes, because this is where the difference between two prices usually hides.

  • Decking. Older Calgary homes often have plank decking that modern shingles can't be nailed to properly, so it needs plywood or OSB over it first. Rotten sheets are replaced only with your written approval, at $120 a sheet.
  • Ice and water shield at the eaves, valleys and around chimneys and vents. Alberta freeze-thaw makes this the difference between a roof and a future ice-dam repair.
  • New flashing at chimneys, walls and skylights. Reused flashing is a common source of leaks on a new roof.
  • Ventilation. An attic without enough airflow cooks shingles from below, and manufacturer warranties can exclude that damage.
  • Tear-off and disposal, including any second layer from an older re-roof.

The two warranties

The shingle maker's limited lifetime warranty covers manufacturing defects in the shingle. Our workmanship warranty is five years on a replacement, and it covers the installation: how it was nailed, flashed and detailed. They cover different failures, and a material warranty doesn't help if the installation was wrong.

How the job runs

Materials arrive a day or two before the crew. Then tear-off, a look at the deck with photos, any rotten wood replaced by signed change order, then underlayment, ice and water shield, flashing, shingles, ridge and vents. Then a full clean-up, a magnet sweep of the property and a final walkthrough with you. The deck photos matter: it's the one moment the roof is open.

READ BEFORE YOU DECIDE

Guides from the library

MORE GUIDES ›
A Calgary roof stripped to bare decking during tear-off
BASICS6 MIN
Installation

Roof replacement, day by day

A roof replacement runs in a fixed order: protect the house and yard, tear off the old roof, inspect and repair the wood deck underneath, then build the new roof up from the eaves to the peak and finish with a magnet sweep for nails. The steps that decide how long the roof lasts are covered up within hours, so they're worth asking about before day one.

New shingles going on around a metal valley during a replacement
BASICS4 MIN
Installation

Preparing your home for a roof replacement

To prepare for a roof replacement, clear the driveway and the drop zone, take pictures and mirrors off top-floor walls, cover anything stored in the attic, keep pets and kids away from the work side, and tell your neighbours. Settle the decking price, start time, weather plan and cleanup in writing before the crew arrives.

Step flashing where a roof slope meets a wall
BASICS7 MIN
Installation

Roof flashing explained: walls, chimneys, valleys and vents

Roof flashing is the metal, or sometimes waterproof membrane, that seals the joints where your roof meets a wall, a chimney, a skylight, a pipe or another slope. Those joints are where most leaks on an otherwise healthy roof start, and the building code Alberta uses sets minimum overlaps for each kind.

Ridge caps and roof vents on a finished Calgary roof
DEEP DIVE6 MIN
Installation

Attic ventilation explained

Your attic needs air flowing in low at the soffits and out high near the peak, so it stays cold in winter and dry all year. The building code asks for vent area of at least 1/300 of the insulated ceiling area, and in Calgary an attic that can't breathe shows up as ice dams, frost on the nails and mould.

A finished asphalt shingle hip roof on a Calgary home
DEEP DIVE5 MIN
Installation

Underlayment and ice and water shield

Underlayment is the sheet laid over the roof's wood deck, under the shingles, and ice and water shield is a self-sealing waterproof membrane used where water is most likely to get under them: the eaves, valleys and around anything that comes through the roof. Alberta's building code requires that eave protection to run at least 900 mm up the slope, because ice dams in a Calgary winter push water uphill under the shingles.

A finished architectural shingle roof on a Calgary home
BASICS6 MIN
Hiring & Costs

What belongs in a roofing contract

A roofing contract should name the exact materials by brand, line and colour, the full scope, the price and payment schedule, both warranties stated separately, and how changes get approved in writing. In Alberta, a contract signed at your home also carries a 10-day cancellation right, and a contractor who takes money before the work is done needs a prepaid contracting licence.

QUESTIONS

STRAIGHT ANSWERS.

How much does a roof replacement cost in Calgary?

It depends mainly on the size of the roof, its pitch and shape, how many layers come off, and the shingle you choose, so we price it from your measured roof rather than quote a range. The quote is itemized and we walk you through it in person before you sign. The cost guide explains what moves the number.

How do I know I need a replacement and not a repair?

Widespread granule loss, brittle shingles that crack rather than bend, damage across several slopes, and a standard shingle past about twenty years all point to replacement. One damaged slope on an otherwise healthy roof is a repair.

Do I pay a deposit?

Yes: 30% on signing, which holds your install date and orders the materials, and the balance on completion. On an insurance job, the payment terms are set out in your written contract. Any contractor in Alberta taking payment before work is complete must hold a prepaid contractor licence. Ours is 360187.

How long does a roof replacement take?

Most Calgary homes take two to four days once the crew is on site, with materials delivered a day or two before. Weather, a large or complex roof, or rot in the decking can stretch it. Your contract gives the start window: within 3 weeks of the deposit.

What happens to my yard and driveway?

We plan where the bin and materials go before the truck arrives, protect what needs protecting, and magnet-sweep the property before we leave so nails don't end up in your tires.

RELATED
ROOF REPLACEMENT

GET AROOF QUOTE.

Add your address and we can measure the roof before we call, so the first conversation starts with real numbers.

OR REACH US DIRECTLY
EMAILcontact@bigboyroofing.ca
GET A ROOF QUOTE

Giving us your number means you're okay with us calling or texting you about your roof (scheduling and quote updates, nothing else). Reply STOP anytime.

GET A ROOF QUOTE