HOME›OUR PROCESS
OUR PROCESS

ADDRESSTO HANDSHAKE.

Send your address. We measure the roof, put one written price on the table, and install in days. Insurance claims add time on the insurer's side, not ours.

  • STAGES3
  • SUB-STEPS9
  • ON SITE2–4 DAYS
  • PHONEONE LINE
CALGARY-BASED · OPEN BOOKING
STAGE 01
01

MEASURE + BOOK

Satellite measurement runs before anyone drives out. We reach out to lock your booking.

  1. 01.1

    Submit your address

    Drop your address on the site and we'll call to understand what's going on with the roof. That call is how we show up with the right crew and the right answer instead of guessing.

↳ NEXTSTAGE 02
STAGE 02
02

QUOTE + SIGN

Every shingle option on paper at the table. Sign the contract, on PDF or on paper, and your copy stays with you.

  1. 02.1

    Every option, printed

    We arrive with a proposal: the IKO shingles we priced for your roof, with material, sqft, colour and warranty. The price holds for 14 days from the date on the proposal.

  2. 02.2

    Walk-through

    We talk through the trade-offs. IKO Dynasty is the one we recommend for most homes, IKO Nordic is the Class 4 impact-rated option, and Cambridge is there for a reason. This is also where we'll ask whether you want roofline lighting priced on the same quote, since the track mounts to the fascia we're already working on.

  3. 02.3

    Sign the contract

    Tick the shingle you want and sign. On a replacement the proposal is your contract and your deposit invoice, with the deposit printed on each option. PDF or paper, whichever you prefer, and a signed copy stays with you.

  4. 02.4

    Insurance handling (if applicable)

    Filing a claim? We submit to your insurer in the format they need and meet your adjuster on the roof. You don't have to learn what a supplement is.

↳ NEXTSTAGE 03
STAGE 03
03

BUILD + WARRANTY

Deposit, install, magnetic sweep, final invoice. Days on-roof, not weeks.

  1. 03.1

    Deposit

    On a replacement you're paying for yourself, a 30% deposit on the option you choose, on signing; an insurance job's payment terms are set out in its contract. The deposit holds your install date and releases the material order. Pay by e-transfer, cheque, cash, or card through a Stripe link. Card is 3% more than the other three.

  2. 03.2

    Install

    Crew on-site early. Tear-off, deck inspection, ice & water shield, underlayment, shingles, ridge cap. Materials land a day or two before the crew, and most roofs take two to four days on site, weather permitting.

  3. 03.3

    Cleanup (and the magnet)

    Magnetic sweep across driveway and lawn. Site looks better than we found it.

  4. 03.4

    Final invoice + warranty

    Final balance due on completion, by e-transfer, cheque, cash or card. Your warranty is stated on the final invoice: 5 years on our workmanship, plus IKO's material warranty on the shingles.

IKO Stormtite synthetic underlayment rolled out on a Calgary roof before shingles
Synthetic underlayment, down before a single shingle.
Rust-streaked cap flashing on a stucco chimney, checked by hand
Chimney flashing. Where a roof leaks if this part is rushed.
Step flashing where a Calgary roof slope meets a wall
Roof meets wall. The other place water finds its way in.
Joan Beckett2 months ago5 out of 5 stars
We had our roof done by BBR in July. They were absolutely great to work with. We are original house owners in Citadel and still had the original shingles. We'd been putting off major repairs for awhile but rain storms back in June made it quite clear that we needed to fix our leaky roof. After our
READ IN FULL ON GOOGLE
GET A QUOTE

TELL US ABOUTYOUR ROOF.

Tell us what's going on and how to reach you. We'll call to set up a time to look at it, then give you one written price.

OR REACH US DIRECTLY
EMAILcontact@bigboyroofing.ca
GET A QUOTE

Giving us your number means you're okay with us calling or texting you about your roof (scheduling and quote updates, nothing else). Reply STOP anytime.

GET A QUOTE